State bid · Illinois
CHANGE ORDER NOTICE I-20-4526 Tri-State Tollway, DSGN REQ On-call and as-needed Phase II Eng. Svs
Solicitation 27-557THA-ENGCO-B-54578 Toll Highway Authority
OpenClosed Due Wednesday, November 11, 2026 at 11:59 PM CST Closed Wednesday, November 11, 2026 at 11:59 PM CST
The Toll Highway Authority seeks on-call, as-needed Phase II engineering services for the Tri-State Tollway in Illinois.
14 days free, no card. After signup this bid opens in GovHub and GovHub starts analyzing it.
Bid details
- Agency
- Toll Highway Authority
- Level
- State
- Location
- Illinois
- Solicitation number
- 27-557THA-ENGCO-B-54578
- Closed
- Wednesday, November 11, 2026 at 11:59 PM CST
- NAICS code (GovHub's match)
- 541330 Engineering Services
State and local notices rarely list a NAICS code, so this is GovHub's match from the notice text. Check the solicitation before you rely on it.
Documents posted
The agency posted 1 file with this solicitation. The files open in GovHub.
- 4526 Change Order Notice V.25.1. Rev.pdf
Open these documents in GovHub. GovHub reads them when it analyzes the bid, then fills out the forms and drafts the response.
See the full solicitation, freeFind the next bid like this, free
Start a free GovHub trial to see the 1 document for this bid. Then GovHub fills out its forms, builds the compliance matrix and drafts your response. Start a free GovHub trial and new bids like this one land in your GovHub inbox with a plain-English summary, every detail and its documents. GovHub fills out the forms and drafts the response.
Free on this page: GovHub's summary, the deadline, the set-aside, the NAICS code and the names of the posted files. In GovHub: the full solicitation and its documents, Analyze this RFP, the forms filled out from your company profile, and a drafted, scored proposal.
14-day free trial. No credit card.
Browse similar bids
Similar open bids
| Bid | Agency | Where | Due |
|---|---|---|---|
| 578-27-003 - Renovate A Section First Floor of Building 1 - Design FY27 | Veterans Affairs, Department of / Veterans Affairs, Department of / 252-Network Contract Office 12 (36C252) | Illinois | Nov 16, 2026 |
| Interconnection Study | Illinois Commerce Commission | Illinois | Nov 17, 2026 |
| Change Order Notice I-25-2005 RM Tollway (I-88), Bridge Recon at CNR, Phase II Engineering Services | Toll Highway Authority | Illinois | Nov 20, 2026 |
| Rebid CVP- Paratransit Vehicle Technical Services RFP | Transportation | Illinois | Nov 24, 2026 |
| Campus Arc Flash Study | Harper College | Illinois | Dec 2, 2026 |
| Request for Professional Services Qualifications (QBS): Photogrammetry and LiDAR Services Retainer | University of Illinois Urbana-Champaign | Illinois | Dec 3, 2026 |
| Creative Exhibit Design Services | Library of Congress / Library of Congress / Contracts Services | District of Columbia | Nov 16, 2026 |
| SAF/SA Campaign Analysis Support | Dept of Defense / Dept of the Air Force / Fa7014 Afdw PK | District of Columbia | Nov 16, 2026 |
Other Illinois bids around this deadline
| Bid | Agency | Closed |
|---|---|---|
| District 3 Waterman Fuel for Diesel, Biodiesel & Gasoline FY27 | Transportation | Nov 12, 2026 |
| REMI Annual Licensing and Maintenance | Commerce and Economic Opportunity | Nov 12, 2026 |
| RENEWAL NOTICE I-12-4746 Elgin OHare W. Access (I-490) RDWY Construction At Touhy Avenue MP 5.75 | Toll Highway Authority | Nov 11, 2026 |
| Woodland Cusd 5: E-Rate services requested (FCC Form 470 no. 270002075) | Woodland Cusd 5 | Nov 11, 2026 |
Respond to bids like this with GovHub
GovHub reads the solicitation, fills out the forms, builds the compliance matrix and drafts the proposal. Save a search and new matching bids land in your GovHub inbox.
No credit card required · 14-day free trial
Listing checked Nov 16, 2026. The summary is written by GovHub from the notice; confirm every detail before you bid. Source: Illinois (BidBuy).